Do you have an under performing supplier and need to turn around performance? Looking to drive cost out going to alternative sources?
I delivered results in the following projects:
• Led product work transfer to Mexico in 3 months duration resulting in full production ramp up, repeat defect elimination, and 40% cost reduction all while leading multiple domestic and international teams from design into production launch.
• Managed customer and supplier change process to facilitate major component work transfer to low-cost Malaysian supplier and leading redesign for $10M annual savings.
• Led the equipment standup at a medical device contract manufacturer through FDA validation activities for installation qualification (IQ), operational qualification (OQ), and production qualification (PQ) to support FDA submittal.